Batch traceability: how to know where every unit came from.
Traceability means you can say in minutes which raw material batch a product was made from and which customers received it. You get there with a few required fields on every stock movement, not with another spreadsheet.
What a batch is and what traceability means
A batch (or lot) is a quantity of one item received or produced under the same conditions: one delivery, one shift, one mix. It has a number, a date and usually a supplier or a production order.
Traceability is the link between batches. Which raw material batch went into which finished batch, and which shipment that batch left in. Without the link, a batch number is just a label.
A serial number is a special case: a batch of one unit. It’s used for machines, devices and anything with a per-unit warranty.
The number can come from the supplier or you can assign it at goods receipt. What matters is that it’s unique for the item and visible on the label, the shelf and the documents.
When you need it
Not every company needs to track batches for every item. Tracking costs the warehouse time, so introduce it where it pays off.
- Where customers or regulations require it.
- When raw materials have a shelf life or vary from delivery to delivery.
- When one complaint could affect many customers and you want to know exactly which.
- When product quality depends on the raw material supplier.
- When you sell goods with serial numbers and warranties.
For screws, packing tape and office supplies, batch tracking is rarely worth it. The decision is per item, not for the whole warehouse.
A useful question for each item: if one delivery has a problem tomorrow, how many customers must I contact? If the answer is “all of them, because I don’t know which”, the batch is worth tracking.
What to record for every batch
The minimum is small. If these fields are filled in on every movement, traceability follows on its own.
- Batch number: the supplier’s or your own, but unique for the item.
- Date received or produced, and expiry date if there is one.
- Supplier and delivery document for raw materials.
- Production order for produced batches, with the raw material batches consumed.
- Location in the warehouse.
- Shipment and customer for every issue.
The weakest link is usually consumption in production. If the shop floor only writes “took 50 kg of flour”, with no batch, the chain breaks right there.
Make recording as easy as possible. Scanning a label or picking from a short list of available batches is far more reliable than typing a number by hand.
Tracing forward and backward
Backward means from the product to the raw material. A customer complains about a product from batch 2611-03. You want to know which raw material batches went in and from which suppliers.
Forward means from the raw material to the customers. A supplier warns you about a specific batch. You want to know which of your products it went into and which customers received them.
A good system answers both questions with one report. If the answer takes three files and half a day, traceability exists only on paper.
Batch size matters too. If a whole month of production is one batch, a problem affects the whole month. Smaller batches, for example per shift or per day, narrow the circle.
Example: a recall on a Friday afternoon
For example: a company makes sauces. A tomato paste supplier reports that batch P-418 may be defective. The company received 600 kg of it three weeks ago.
- You look up batch P-418 and see it was used in four production orders.
- Those four orders produced three finished batches, 2,400 bottles in total.
- Of those, 1,900 have shipped to 11 customers and 500 are still in stock.
- You block the 500 bottles in stock and email the 11 customers with the exact batches.
Without traceability, the same company would have to pull everything produced in that period or call every customer. The difference is hours of work and a lot of trust.
If the batch later turns out to be fine, the blocked bottles are released with one entry. Nothing is thrown away for nothing.
The same report also answers the supplier. You can show exactly how much of the batch was used, how much is in stock and how much is with customers, if it comes to a claim.
Shelf life, FIFO and FEFO
When batches expire, issue order matters. FIFO issues the oldest delivery first. FEFO issues the batch with the nearest expiry date first.
The two often match, but not always. If a newer delivery has a shorter shelf life, FEFO saves you write-offs. The system can suggest the batch and the warehouse confirms.
A dashboard of batches expiring in the next 30 days also helps. It gives you time to sell or use them instead of writing them off.
Add a batch status as well: available, blocked, on hold for inspection. A blocked batch is visible in stock but can’t be issued to a customer or to production by mistake.
How to get started
Don’t introduce batches for the whole warehouse at once. Start with the items where the risk is highest.
Run a test trace once a quarter. Just like cycle counting, a small regular check catches gaps early.
How we do it at Leanovix
In Leanovix, batches are part of the inventory module, and stock is issued by FIFO. Tracing a batch through production all the way to the customer comes with work orders, which we build around your process, on request.