Bill of materials: what it is and how to get it right.
A bill of materials is the list of everything that goes into one unit of a product, with quantities and units of measure. Product cost, material purchasing and the production plan all depend on it.
What a bill of materials is
A bill of materials (BOM) is the product’s recipe. It says what you need, and how much, to make one unit or one batch.
Some companies call it a recipe, a formula or a material standard. The name differs; the idea is the same.
A BOM can be for one unit or for a standard batch. In food and chemicals, a batch basis is often easier, for example per 100 kg of mix. In furniture and metalwork it’s usually per unit.
If the BOM lives only in the foreman’s head, every costing and every material order depends on him.
One BOM serves several departments at once. The office prices from it, purchasing orders materials, the warehouse prepares the issue and the shop floor knows what to use. If it’s wrong, the mistake repeats everywhere.
Single-level and multi-level
A single-level BOM lists only the direct materials. It suits simple products: a package, an assembly of bought-in parts.
A multi-level BOM includes sub-assemblies that have their own BOM. For example, a table top is a separate sub-assembly with its own materials and operations.
A multi-level structure lets you make sub-assemblies to stock and see which products are affected when one of them changes.
Don’t add more levels than you need. A sub-assembly deserves its own BOM if it’s stocked, used in several products or made at a separate workstation. Otherwise it’s just a line.
Another case is products with variants: one table in three sizes and five colours. Instead of 15 separate BOMs, you can have a common base and variable lines for size and colour. That saves upkeep when variants multiply.
What each line contains
- Item: material, bought-in part or sub-assembly, with the same code as in the warehouse.
- Quantity per unit or per standard batch.
- Unit of measure: pieces, kilograms, metres, square metres.
- Waste as a percentage, if the material is cut or lost.
- Alternative material, if there’s an approved substitute.
- The operation where it’s consumed, if timing matters.
The most common problem is the unit of measure. The warehouse buys in sheets, the BOM is in square metres. Without a clear conversion, stock will never match.
Keep the quantity net, without waste, and put waste in its own field. That way you see how much material really goes into the product and how much is lost along the way. When the process changes, you only change the percentage.
Don’t forget packaging and labels. They’re often missing from the BOM because they’re “not part of the product”. Then they run out on shipping day.
BOM and routing
The BOM says what goes into the product. The routing says how it’s made: operations, sequence, machines and time per operation.
Together they give the full picture. Materials come from the BOM; labour and machine time come from the routing. That’s also how product cost is calculated.
The routing doesn’t need to be detailed from day one. Start with the operations and a rough time for each. Then refine it with real reports from the shop floor.
An example routing for the table top: cutting 6 minutes, edge banding 8 minutes, sanding 10 minutes and lacquering 12 minutes. Without it, you know what you need but not how long it will take.
Example: a coffee table
For example: a small furniture workshop makes a coffee table. The quantities are hypothetical.
- Table top (sub-assembly): 1 pc.
- Steel legs: 4 pcs.
- Screws 4 × 30: 16 pcs.
- Lacquer: 0.15 l.
- Shipping carton: 1 pc.
The top has its own BOM: 0.36 m² of MDF board with 12% waste, 1.8 m of edge banding and glue. Its routing is cutting, edge banding, sanding and lacquering.
An order for 40 tables immediately gives the quantities: 160 legs, 640 screws, 6 litres of lacquer and about 16 m² of board. The system compares them with stock and shows what’s missing.
The board is 40 × 0.36 m² plus 12% waste, about 16.1 m². If board is bought in sheets of 5.8 m², you need three sheets. This is exactly where unit conversion matters.
If there are 120 legs in stock, the system shows a shortage of 40 and can suggest a purchase order. Without a BOM, you find out when assembly stops.
Versions and changes
Products change. A supplier, a material or a size changes. If you simply overwrite the BOM, you lose the history and old orders show the wrong data.
- Keep versions with a date from which they apply.
- Record who changed the BOM and why.
- Check open orders whenever something changes.
For example, the workshop switches from steel legs to wooden ones. The new version applies from 1 Dec, and orders released before that keep the old one. Costing on old orders isn’t rewritten after the fact.
Checklist for an accurate BOM
If actual consumption keeps exceeding the standard, the problem is in the BOM or in the process. Both are worth understanding before you change the price.
If you’re starting from scratch, don’t write BOMs for the whole range at once. Start with the products that bring the most revenue and add the rest as they go into production.
How we do it at Leanovix
In Leanovix, bills of materials are built on request, around your process. During implementation we bring over your existing recipes, even if they live in Excel. Today the production planning module ranks orders by machine, due date and priority.