BlogProduction

How to calculate the cost of a product.

Product cost is the sum of materials, labour, machine time, a share of overhead and waste for one unit. If any of the five is missing, your margin looks better than it is.

What product cost is and why it drifts from reality

Product cost is what it costs you to make one unit, before profit. Prices, discounts and the decision whether a product is worth making all start from it.

It’s an internal management number. Your accounting software records the company’s costs as a whole; costing answers a different question: what does this exact unit cost. The two complement each other, they don’t replace each other.

It usually drifts from reality for three reasons. The costing is old and material prices have changed. Overhead isn’t included. Waste is assumed to be zero.

Tell standard cost from actual cost. Standard cost is the calculation before production. Actual cost comes from the materials and hours booked on a specific order. The gap between them is the most useful number on the shop floor.

The five components

  1. Materials. Everything that goes into the product, in quantities from the bill of materials.
  2. Direct labour. People’s hours on the product, times the hourly rate including employer costs.
  3. Machine time. Machine hours at an hourly rate: depreciation, power, maintenance.
  4. Overhead share. Rent, heating, management, warehouse, allocated by a clear rule.
  5. Waste and scrap. Material you buy that never makes it into the product.

The first three are fairly easy to measure. The last two require a decision, which is why they’re the ones most often left out.

For the labour rate, don’t use net pay alone. Include employer contributions, holidays and the time people are at work but not on a product. Otherwise labour always looks cheaper than it is.

The machine rate works the same way: annual depreciation, power and maintenance, divided by the machine’s real working hours in a year.

Example: a steel wall bracket

For example: a company makes a steel wall bracket. All numbers below are hypothetical and only illustrate the method.

  • Steel: 4.2 kg × 1.10 €/kg = 4.62 €.
  • Paint and screws: 0.35 € + 0.18 € = 0.53 €.
  • Cutting waste: 8% of the steel = 0.37 €.
  • Direct labour: 0.5 h × 12.00 €/h = 6.00 €.
  • Laser cutting: 6 minutes at 30.00 €/h = 3.00 €.
  • Overhead: 0.5 labour hours × 6.00 €/h = 3.00 €.

Product cost: 17.52 € per unit. If you sell the bracket for 22.00 €, the margin is 4.48 €, or about 20%.

Now imagine the costing had been done without overhead and waste. It would show 14.15 € and a margin of 7.85 €. Discount decisions would start from a number that doesn’t exist.

If a salesperson gives a large customer 15% off, the price becomes 18.70 €. On the full costing, 1.18 € per unit is left. On the incomplete one, it looks like 4.55 €. One deal is good; the other barely covers its costs.

How to allocate overhead

Overhead doesn’t belong to any one product, but someone has to pay for it. The simplest rule is a rate per production hour.

Add up a month’s overhead and divide it by that month’s production hours. For example, 18,000 € of overhead and 3,000 production hours give 6.00 € per hour.

  • Rate per labour hour: fits when the work is mostly manual.
  • Rate per machine hour: fits when machines set the pace.
  • Percentage of materials: fits when materials are most of the cost.

Pick one rule and apply it consistently. Accuracy comes from consistency more than from a clever formula.

Review the rate when overhead or workload changes significantly. Fewer orders mean fewer hours, so each hour carries a bigger share.

If your products have very different profiles, for example some manual and some almost fully automated, you can use two rates. More than two rarely adds useful accuracy in a small company.

Waste and scrap: the small percentage that eats the margin

Waste is planned loss: offcuts, machine set-up, the end of a roll. Scrap is unplanned: defective units that can’t be sold.

Include waste in the costing as a percentage of material. Track scrap separately and compare it with the costing every month. If scrap grows, the cause is in the process, not the price.

Record scrap with a reason: wrong set-up, faulty material, human error. After a few months you’ll see which reason is most common and where to start.

In the example above, 8% waste looks small. At 2,000 brackets a month, that’s about 740.00 € of steel you buy and throw away.

When to recalculate

Costings go stale quietly. Materials go up, wages rise, and the product keeps selling at the old price.

  • Whenever the purchase price of a key material changes.
  • When wages or machine hourly rates change.
  • When actual shop floor time differs from the costed time.
  • At least once a year for every product, even if nothing seems to have changed.

You don’t have to recalculate everything by hand. If the costing is linked to the bill of materials and to purchase prices, a new material price flows through everywhere it’s used.

Compare standard cost with actual cost from production orders. The gap shows where the costing is wrong.

Costing checklist

How we do it at Leanovix

In Leanovix, stock is valued at weighted average cost today. Product cost from a bill of materials, with plan and actual side by side, comes with work orders and BOM, which we build around your process. The overhead rule is yours; we build it the way you work.

Frequently asked questions about product costing

What’s the difference between product cost and selling price?

Product cost is what one unit costs you. The selling price is that cost plus the margin you want to earn.

Should rent be included in product cost?

Yes, as part of the overhead share. Otherwise every unit looks more profitable than it is, and rent gets paid out of the margin.

How often should I update my costing?

Whenever material prices or wages change significantly, and at least once a year for every product.

Show us how you work today.

In 30 minutes we’ll find the process that costs you the most and see how it would look in Leanovix.

Book a demo